Armenia’s prime minister said the country plans to connect its electricity grid with Azerbaijan and Turkey, a notable piece of infrastructure diplomacy from a country that, as Euronews notes, was at war with Azerbaijan three years earlier and still keeps its border politics close to the surface.
Speaking at DigiTec 2026 in Yerevan, Nikol Pashinyan said Armenia would link its network to both neighbours while continuing to rely on existing connections with Iran and Georgia. The immediate reason was less poetic than peace slogans tend to be: Armenia’s AI push is eating through electricity faster than policymakers expected.
Pashinyan said Armenia had surplus generating capacity eight months earlier. Now, after a burst of data-centre expansion, it is looking for import suppliers. That is the useful number in the story: not a vague promise of becoming an AI hub, but a shift from surplus to expected imports inside less than a year.
One project helps explain the change. Euronews reported that Firebird alone plans infrastructure with 300 megawatts of capacity by the end of 2027. For a small country, that is not a rounding error. It is the sort of load that turns “digital ambition” into a transmission problem.
Rev Lebaredian, Nvidia’s vice president for physical AI simulation, shared the stage with Pashinyan and pressed the point in blunter industrial terms, asking how Armenia could move “from hundreds of megawatts to many gigawatts.” AI, for all the talk about models and software, still arrives with cables, substations and somebody else’s land use dispute.
The political part is harder than the engineering. Armenia and Azerbaijan do not have the luxury of pretending power lines are just power lines. Pashinyan cast the interconnection plan as part of a broader regional opening, tying it to what he called the “Trump Route for International Peace and Prosperity” project and to Armenia’s “Crossroads of Peace” agenda. Leaders often decorate hard infrastructure with grand names. The bills, unfortunately, remain numerate.
Still, interconnection changes incentives in a way speeches do not. If Armenia becomes a buyer of electricity from neighbours and a seller of AI-related services, each side acquires a reason not to break the furniture. Lebaredian made that case explicitly, arguing that shared commercial dependence could improve the odds of lasting peace. That is not proof of harmony, but it is at least a mechanism, which is more than most regional optimism offers.
Pashinyan also said Armenia plans to diversify supply through solar power, storage, energy-efficiency measures and a new nuclear plant. That list is long because the problem is large. Grid links can broaden supply options, but they do not spare Armenia from having to build at home if AI demand keeps climbing.
Euronews also cited Armenian news agency ARKA saying Armenia and Turkey have discussed restoring the inactive Gyumri-Kars power line. If that line moves from discussion to use, the symbolism will get headlines. The economics deserve more attention. Armenia appears to have discovered that an AI strategy without enough electricity is just a brochure with fans attached.
Sophia Borg
Alex de Valletta
Dua Mifsud